Client contacted us for commercial HVAC testing, adjusting, and balancing services at their Plano facility. The project required a full TAB scope across multiple units including 1 AHU, 15 RTUs, 5 supply systems, 1 gas unit heater, 6 exhaust fans, and 363 grilles and diffusers. Our team completed Phase 1 Air Balance, bringing all systems into proper airflow specification and documenting results for the building record. RTU commissioning was verified using the Trane Symbio Service and Installation tool, confirming controls connectivity and system performance on all applicable units.



When a client came to us with a leaking and inefficient cooling unit that was failing to keep their building at the required temperature, we knew immediate action was needed. The old unit was leaking water everywhere, leading to potential damage and energy inefficiency. Our expert team quickly assessed the situation and recommended replacing the outdated unit with a new BAC cooling tower. We meticulously replaced the piping to ensure optimal performance and installed the new BAC cooling tower, restoring efficient and reliable cooling to the building. The client now enjoys a more efficient system, reduced energy costs, and peace of mind knowing their cooling needs are expertly managed.




Homeowner called, concerned about an outdated and inefficient HVAC system for their 2-story home. Big D Mechanical stepped in, upgrading the entire system: furnace, coil, condenser, and installing a new 4-ton American Standard split system. Homeowner is now relaxing comfortably in their newly updated media room thanks to this comfort efficient upgrade.